Technical Documentation
- About Us
-
Businesses
-
Main Menu
- Businesses
- Our Businesses Overview
-
Textile
-
Businesses
- Textile
- Overview
- Markets
- Brands
- Expertise
- Media
- Contact Us
- Chemical
- Flooring
-
Performance Solutions by Milliken
-
Businesses
- Performance Solutions by Milliken
- Overview
- Consulting Services
- Education and Events
- Resources
- Virtual Tour
- Contact Us
- Products
-
Industries
-
Main Menu
- Industries
- Industries Overview
- Agriculture
- Apparel
- Automotive and Transportation
- Building, Construction, and Infrastructure
- Coatings, Paints, and Inks
- Commercial
- Consumer Goods
- Education
- Energy and Utilities
- Government and Defense
- Healthcare and Life Sciences
- Hospitality
- Manufacturing
- Packaging and Print
- Residential
- Sustainability
- Careers
INSTALLATION INSTRUCTIONS
Learn more about installing your Milliken productsRecommended Installation Guidelines
show documents
WARRANTIES
So confident are we in our products and processes that we offer one of the most robust warranty packages to our Australian and New Zealand markets.Product Warranty Documents
SITE-RELATED SOLUTIONS (SRS): A COMPLETE SYSTEM
Site-Related Solutions Helps You Deal With Whatever Combination of Site Conditions You May Encounter.
SRS Documents
Is your site New Construction or Renovation?
Do you want to use an Adhesive or Adhesive-Free solution?
How soon do you want to install?
How soon do you want to install?
Is your site On-Grade or Above-Grade?
Do you want to use an Adhesive or Adhesive-Free solution?
Is there a vapor barrier intact?
Do you want to use an Adhesive or Adhesive-Free solution?
Will you be moisture testing?
Do you want to use an Adhesive or Adhesive-Free solution?
Do you want to use an Adhesive or Adhesive-Free solution?
What is your current RH Level?
What is your current RH Level?
Your Solution is Tractionback® Plus
- For early installation, minimum 30 days after concrete has been poured, or scenarios where very high moisture is a concern, and an adhesive-free solution is desired
- NO moisture testing is required.
- NO RH or pH limits.
Your Solution is Tractionback® Plus
- For use where very high moisture is a concern.
- NO moisture testing is required.
- NO RH or pH limits.
Your Solution is Moisture Extreme
- For early installation, minimum 30 days after concrete has been poured, or scenarios where very high moisture is a concern.
- NO moisture testing is required.
- NO RH or pH limits.
Your Solution is Moisture Extreme
- For use where very high moisture is a concern.
- NO moisture testing is required.
- NO RH or pH limits.
Your Solution is Tractionback®
- Works for ALL on-grade and above-grade scenarios for new construction where an adhesive-free solution is desired, minimum 90 days after concrete has been poured.
- NO moisture testing is required for new construction.
- NO RH or pH limits for new construction.
Your Solution is Tractionback®
- On-Grade: Works for any on-grade renovation scenario where an adhesive-free solution is desired and concrete RH is 85% or below.
Your Solution is Tractionback®
- Above-Grade: Works for ALL above-grade renovation scenarios where an adhesive-free solution is desired.
- No moisture testing is required for above-grade renovation.
- No RH or pH limits for above-grade renovation.
Your Solution is Non-Reactive Standard
- Works for ALL on-grade and above-grade new construction scenarios, minimum 60 days after concrete has been poured.
- NO moisture testing is required for new construction.
- NO RH or pH limits for new construction.
Your Solution is Non-Reactive Standard
- On-Grade: Works for any on-grade renovation scenario where concrete RH is 95% or below.
Your Solution is Non-Reactive Standard
- Above-Grade: Works for ALL above-grade renovation scenarios.
- No moisture testing is required for above-grade renovation.
- No RH or pH limits for above-grade renovation.
Play
ACOUSTIC SPECIFICATIONS
Acoustic SolutionsAcoustic Specifications Documents
SHOW DOCUMENTS
ADHESIVE TECHNICAL DOCUMENTS
Adhesive SolutionsAdhesive Product Suggestions
CARPET CARE & LVT MAINTENANCE
Consistent, thorough cleaning is required to remove soil that has bonded to carpet fibers to ensure optimum performance and appearance is maintained. View our recommended methods of our carpet's care and maintenance.
Carpet Care & Maintenance Recommendations
BUILDING PRODUCT INFORMATION REQUIREMENTS (BPIR)
BPIR Product Review Summary
All Current Products
Product Specifications Appendices
All Current Products
SPECIFICATIONS | FIRE TESTING | ACCS & ECS CERTIFICATION
Product Specifications
All Current Products
show documents
Fire Test Certificates
All Current Products
show documents
ACCS/ECS Certificates
All Current Products
show documents
PRODUCT STEWARDSHIP
Continuing Milliken’s heritage of over a century of environmental stewardship, and our “No Carpet to Landfill Pledge”, Milliken carpet takeback program provides three non-landfill solutions to ensure that used carpet is recovered and managed in an environmentally, socially and financially responsible way.